PENGARUH PEMINDAHAN SUTT 150 KV CELUKAN BAWANG – KAPAL TERHADAP ALIRAN DAYA SISTEM BALI
Abstrak
To meet the energy needs in Bali Island which is increasing by 6 - 9% in the next 5 years, the government has been working on the development of Celukan Bawang power plant. The Celukan Bawang power plant project completed since 2013 has been fully operational in August 2015 as an outlet for the transmission of 150kV High Voltage Air Line (SUTT) transmission. Related to the issue of social issues with the keyword of Desa Celukan bawang on the development which is the home for them SUTT, the PT PLN (PERSERO) is asked to implement a strategy for securing the distribution so that the Bali system is safe when the re-route SUTT route. From the simulation result using PSSE Tools, Bali's electric power flow is simulated in 3 scenarios. Scenario 1 is free 1 Circuit Celukan Onion - Ships and Operation of the plant in accordance with the order, scenario 2 off 1 circuit Celukan Onion - Ship and acceleration Plant in South Line, and scenario 3 is done by loose both Celukan Onion - Ship and Southern remote operation. Based on the results of the analysis of the following scenarios filled scenario 1 has more economic value, reliable and quality compare other scenarios.
##plugins.generic.usageStats.downloads##
Referensi
[2] Siemens Industry, Inc. All rights reserved. 2014 “PSS®E-33 Advanced Power Flow”.Jerman : Siemens.
[3] Sudirham, Sudaryatno. 2012. “Analisa Sistem Tenaga”. Bandung: Darpublik.
[4] Marsudi, D. 2006. “Pembangkitan Energi Listrik”. Jakarta: PT. Erlangga.
[5] Marsudi, D. 2006. “Operasi Sistem Tenaga Listrik”. Jakarta: Balai Penerbit & Humas ISTN
[6] Meilandari, E.D, Hartati, R.S, Sukerayasa, I.W. 2012. “Analisa Aliran daya Optimal Pada Sistem Kelistrikan Bali” (Jurnal vol.11 No.1).Denpasar: Universitas Udayana.
[7] Pramana, A.E. 2015. “Studi Rugi Daya Sistem Kelistrikan Bali Akibat Perubahan Kapasitas Pembangkitan di Pesanggaran” (Tugas Akhir). Denpasar: Universitas Udayana.
[8] Angga, M., Furqon, M. 2013. “Panduan Simulasi Aliran Daya dengan PSS/E 31” Denpasar: PT. PLN (Persero) P3B Jawa Bali
[9] Lidya, A. 2015 “Studi Aliran Daya Pada Sistem Kelistrikan Sumatera
Bagian Utara (Sumbagut) 150 kV dengan Menggunakan Software Powerworld Versi 17” (VOL.11 NO.30/MEI 2015) Medan : Universitas Sumatera Utara.
[10] Badru, T. 2012 “Analisis Pembebanan Ekonomis pada Jaringan 500 kV Jawa Bali Menggunakan Software PowerWorld” (JURNAL TEKNIK ITS Vol. 1, No. 1 (Sept. 2012) ISSN: 2301-9271) Surabaya : Institut
Teknologi Sepuluh Nopember.

This work is licensed under a Creative Commons Attribution 4.0 International License