PENGGUNAAN METODE PENJADWALAN BERULANG (REPETITIVE SCHEDULING METHOD) PADA PENGERJAAN PROYEK PERUMAHAN (Studi Kasus Pada Proyek Perumahan Beranda Mumbul)
Abstrak
Construction project is a process that manages several resources so it canachieve an aim. Planning and scheduling at construction project are related to time,
cost and quality required since the balance of those three aspects is the main goal
that will be pursued. There are some scheduling methods which are usually used in
construction project completion. A Repetitive Scheduling Method is a kind of
scheduling methods that is used for a project which has repetitive activities. This
method enables showing resources management that contains of human resources,
tools and materials without separating among those aspects. Applying RSM at
Beranda Mumbul housing can shorten completion day from 31 weeks to 27 weeks
and decrease the cost from Rp. 26.575.454,- to Rp. 25.424.127,- in a unit.
##plugins.generic.usageStats.downloads##
##plugins.generic.usageStats.noStats##
##submission.howToCite##
WIRANATA, Anak Agung; PARAMI DEWI, A.A Diah; NURYAWAN, I Made.
PENGGUNAAN METODE PENJADWALAN BERULANG (REPETITIVE SCHEDULING METHOD) PADA PENGERJAAN PROYEK PERUMAHAN (Studi Kasus Pada Proyek Perumahan Beranda Mumbul).
Jurnal Ilmiah Teknik Sipil, [S.l.], aug. 2009.
ISSN 2541-5484.
Tersedia pada: <http://103.29.196.112/index.php/jits/article/view/3561>. Tanggal Akses: 04 mar. 2026
Terbitan
Bagian
Articles
Kata Kunci
Time, RSM, Result.