ASTANA, I Nyoman Yudha. PERENCANAAN WAKTU PELAKSANAAN PROYEK DENGAN MEMPERTIMBANGKAN METODE PEMBAYARAN (STUDI KASUS: PROYEK HOTEL CITADINES BERAWA BEACH, BADUNG, BALI). Jurnal Ilmiah Teknik Sipil, [S.l.], v. 26, n. 2, p. 156-164, july 2022. ISSN 2541-5484. Available at: <http://103.29.196.112/index.php/jits/article/view/91299>. Date accessed: 17 dec. 2025. doi: https://doi.org/10.24843/JITS.2022.v26.i02.p10.