Frederika, A.
(2012).
ANALISIS PERCEPATAN PELAKSANAAN DENGAN MENAMBAH JAM KERJA OPTIMUM PADA PROYEK KONSTRUKSI (Studi Kasus: Proyek Pembangunan Super Villa, Peti Tenget-Badung).
Jurnal Ilmiah Teknik Sipil, .
Retrieved from http://103.29.196.112/index.php/jits/article/view/3653