Frederika, A., Wiranata, A., & Larasati, K. (2014). PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN PEKERJAAN BALOK STRUKTUR BETON GEDUNG ANTARA METODE KONVENSIONAL DENGAN PRECAST (STUDI KASUS: GRAND WHIZ HOTEL, GATOT SUBROTO BARAT). Jurnal Ilmiah Teknik Sipil, . Retrieved from http://103.29.196.112/index.php/jits/article/view/30555